Ashland has worked with all the major FRP design and inspection firms over the years. Our reputation is at stake every time we recommend one of these firms to EPCMs and end users. Maverick never disappoints. Their expertise, wisdom and execution is unmatched in the industry.

Thomas L. Johnson
Ashland, Inc.

  • Maverick was responsible for the FRP engineering and technical support for nearly all FRP equipment required for the new construction of a copper metal processing plant. This included technical evaluation and inspection of vendor calculations, and drawings for technical merit and project compliance of over 200 pieces of FRP equipment (including 30,000 m of FRP piping). Detailed engineering, analysis and analytical testing was performed to facilitate and support the project. Maverick also provided continuous on-site insections of site installation contractors.
  • Maverick provided FRP engineering and technical consulting for the new construction of a rare earth mineral processing plant. The technical support involved assistance with vendor selection including shop audits to evaluate vendor capabilities and quality, drawing review for compliance and in-process inspection. FRP engineering involved the evaluation of acceptable nozzle loadings on FRP tanks and pipe stress analysis of system piping. Maverick also supplied supports for pipe sizes ranging from 2 inches through 18 inches.
  • Maverick provided the FRP engineering and technical support for nearly all FRP equipment for new construction of a nickel metal processing plant. The effort included technical evaluation and inspection of FRP equipment, vendor calculations, drawings for technical merit and project compliance of over 400 pieces of FRP equipment (storage tanks, process vessels, pressure vessels, stacks and scrubbers and 60,000 meters of FRP piping). Detailed engineering and analysis was performed as necessary on technical data to facilitate and support the project. Maverick also provided over 13,000 supports from 1 inch to 36 inches in diameter.
  • Maverick provided the FRP engineering, construction drawings and technical guidance for replacing failed PVC piping with FRP piping for the electrowinning pump piping and distribution headers. The effort also included writing material and fabrication specifications.
  • Maverick provided site inspection services for all FRP process vessels and piping of gas cleaning systems of two sulfuric acid plants.

Want to Know More about Maverick’s Work?

If you’re looking for more information about the kind of work Maverick Applied Science does, check out our various projects.

Learn More...

From the Maverick Blog

  • Blog Article – Pipe Stress Analysis of Nonmetallic Piping Systems

    Plant Owners and Engineers are becoming much more knowledgeable regarding design concerns and expectations for nonmetallic piping systems....

    Read More ...

Hazardous Chemical Byproducts and FRP: What You Should Know

Waste incineration facilities dispose of some of the most hazardous and corrosive by-products in the chemical process industry. Find out why FRP...

Learn More...

Maverick Webcast

Expansion Joints for FRP Connections

Presented by Rob Coffee at the 2nd Annual Plant Engineer’s FRP Forum. Rob is the VP of Sales and Marketing at Proco Products, Inc., and he discusses Expansion Joints for FRP Connections.

View The Webcast Here...